Cable Knitting Pattern 39
Multiple of 6 stitches, plus 2.
Right side: P1, * k1, p4, k1, repeat from * to last st, p1.
Wrong side: K1, * p1, k4, p1, repeat from * to last st, k1.
Multiple of 6 stitches, plus 2.
Row 1 (RS): P1, *1/1 LPC, p2, 1/1 RPC, repeat from * to last st, p1.
Wrong side rows: Knit the knit stitches and purl the purl stitches.
Row 3: P2, *1/1 LPC, 1/1 RPC, p2, repeat from *.
Row 5: P3, *1/1 RC, p4, repeat from * to last 5 sts, 1/1 RC, p3.
Row 7: P2, *1/1 RPC, 1/1 LPC, p2, repeat from *.
Row 9: P2, *1/1 LPC, 1/1 RPC, p2, repeat from *.
Row 11: P3, *1/1 RC, p4, repeat from * to last 5 sts, 1/1 RC, p3.
Row 13: P2, *1/1 RPC, 1/1 LPC, p2, repeat from *.
Row 15: P1, *1/1 RPC, p2, 1/1 LPC, repeat from * to last st, p1.
Row 17: 1/1 RPC, p4, *1/1 LC, p4, repeat from * to last 2 sts, 1/1 LPC.
Row 19: K1, p4, *1/1 RPC, 1/1 LPC, p2, repeat from * to last 3 sts, p2, k1.
Row 21: K1, p4, *1/1 LPC, 1/1 RPC, p2, repeat from * to last 3 sts, p2, k1.
Row 23: 1/1 LPC, p4, *1/1 LC, p4, repeat from * to last 2 sts, 1/1 RPC.
Repeat rows 1-24.
Abbreviations:
1/1 RPC: Skip the first stitch, knit the second stitch, leave on needle, then purl the skipped stitch. Slip both stitches from the needle together.
1/1 LPC: Skip the first stitch, purl through the backloop the second stitch, then knit the skipped stitch. Slip both stitches from the needle together.